Timur Laut Semarang, Jawa Tengah

Muriah PSC

Detail
Tipe Kontrak:PSC
Area (km²):2,823
Status:Produksi
Participating Interest:Saka Energi Muriah Ltd (100%)
Operator:Saka Energi Muriah Ltd
Kontrak Habis:Desember 2026
Provinsi Jawa Timur

Pangkah PSC

Detail
Tipe Kontrak:PSC
Area (km²):784
Status:Produksi
Participating Interest:Saka Indonesia Pangkah Limited (65%) Saka Pangkah LLC (10%) Saka Pangkah B.V (25%)
Operator:Saka Indonesia Pangkah Limited
Kontrak Habis:May 2026 (PSC) May 2046 (Gross Split)
Utara Pulau Madura

Ketapang PSC

Detail
Tipe Kontrak:PSC
Area (km²):885
Status:Produksi
Participating Interest:Petronas Carigali Ketapang II Ltd. (48.5%) Petronas Carigali Ketapang Ltd. (29.1%) PT SAKA Ketapang Perdana (19.4%) PT Petrogas Jatim Sampang Energi (3%)
Operator:Petronas Carigali Ketapang II Ltd
Kontrak Habis:June 2028
Lepas Pantai Maluku

Blok Yamdena Barat

Detail
Tipe Kontrak:Gross Split
Area (km²):4925.4
Status:Eksplorasi
Participating Interest:PT Saka Energi Yamdena Barat (100%)
Operator:PT Saka Energi Yamdena Barat
Kontrak Habis:May 2048
Kalimantan Timur sampai Timur Balikpapan

Muara Bakau PSC

Detail
Tipe Kontrak:PSC
Area (km²):795
Status:Produksi
Participating Interest:Eni Muara Bakau BV (55%) Neptune Energy Muara Bakau BV (33.334%) PT Saka Energi Muara Bakau (11.666%)
Operator:Eni Muara Bakau BV
Kontrak Habis:May 2048
Lepas Pantai Maluku

Sesulu Selatan PSC

Detail
Tipe Kontrak:PSC
Area (km²):625.27
Status:Pengembangan
Participating Interest:PT Saka Indonesia Sesulu (100%)
Operator:PT Saka Indonesia Sesulu
Kontrak Habis:May 2039
Kutai Basin

Blok Pekawai

Detail
Tipe Kontrak:Gross Split
Area (km²):3,499.61
Status:Eksplorasi
Participating Interest:PT Saka Energi Sepinggan (100%)
Operator:PT Saka Energi Sepinggan
Kontrak Habis:May 2048
Kabupaten Barito Utara, Provinsi Kalimantan Tengah

Bangkanai PSC

Detail
Tipe Kontrak:PSC
Area (km²):1,395
Status:Produksi
Participating Interest:Medco Energi Bangkanai Ltd. (54%) PT Saka Bangkanai Kalimantan (30%) Medco Energi Central Kalimantan Ltd. (11%) Medco Energi Kerendan Ltd. (5%)
Operator:Medco Energi (West Bangkanai) Limited
Kontrak Habis:December 2035
Kabupaten Barito Utara, Provinsi Kalimantan Tengah

Bangkanai Barat PSC

Detail
Tipe Kontrak:PSC
Area (km²):5,462
Status:Eksplorasi
Participating Interest:Medco Energi (West Bangkanai) Limited (70%) PT Saka Energi Bangkanai Barat (30%)
Operator:Medco Energi (West Bangkanai) Limited
Kontrak Habis:May 2043
Lepas Pantai dan Darat antara Jawa Timur dan Jawa Tengah

Sangkar PSC

Detail
Tipe Kontrak:PSC
Area (km²):8,122.58
Status:Eksplorasi
Participating Interest:PT Saka Eksplorasi Timur (100%)
Operator:PT Saka Eksplorasi Timur
Kontrak Habis:June 2053